Crew Transfer Vessels

Our wind farm crew transfer vessels range from 16 meters to 27 meters in length, and are designed with the needs of our customers – as well as the safety and comfort of passengers – in mind. Our purpose-built crew transfer vessels (CTVs) have a proven track record of transferring personnel and equipment in complete safety. We have provided crew transfer services at all Taiwanese wind farms constructed so far: Taipower Phase 1, Formosa 1&2  and Yunneng.

We regularly conduct refresher training of our Integrated Management System (IMS). The IMS complies with the guidelines of the ISM code to ensure all our systems and procedures operates to flag state requirements and governs the health and safety of our employees, environmental protection, and safe operation of our vessels.

Routine internal IMS training ensures our Taiwanese employees are in compliance with local regulations and adhere to guidelines set by the IMO policies including ISM Code , Marpol , Solas and MLC. By following the “Just Culture” vision set by our parent company Global Marine Group, CWind Taiwan provides the most sustainable and cutting-edge solutions for our clients.

Crew Transfer Vessels

 

CWind Phenom (奔能號)

24.89m
27kn

Fastest CTV with largest passenger capacity

CWind Phoenix (奔馳號)

24.89m
27kn

Fastest CTV with largest passenger capacity

CWind Phantom (奔騰號)

27.4m
27kn

The aluminium catamaran is the largest addition to the CWind CTV fleet

CWind Resolution (堅定號)

18.5m
27kn

CWind Resolution is the latest addition to our Taiwanese fleet.

Ocean Surveyor 3 (海洋探勘者三號)

16.05m
28kn