Survey

Collecting sufficient data is vital. From the bathymetry survey of the channel, unexploded ordnance risk assessment, sediment movement and sampling to underwater archaeology and cultural heritage, survey data can help your planning construction and maintenance accurately.

Collecting sufficient data is vital. From the bathymetry survey of the channel, unexploded ordnance risk assessment, sediment movement and sampling to underwater archaeology and cultural heritage, survey data can help your planning construction and maintenance accurately.

The use of multi-beam and side-scan sonar surveys to detect cable exposure and measure depth of sediment cover over cable by comparison of seabed with previous surveys. Use of high resolution MBES digital terrain models, with highly accurate vertical correction for tides to monitor cable depth of cover without the use of ROVs. Acquisition speeds of 3-4 knots.

To support the pre-requisite of insurance risk assessment and authority license acquisition, we deliver unexploded ordnance survey in offshore wind farm to identify potential obstructions.

Inherited from one of the parent companies, IOVTEC, we provide integrated service package including survey techniques, Taiwan-flagged survey vessels, local experienced surveyors and state-of-the-art survey equipments. Through our track records across Europe and Taiwan, we enhance your knowledge and understanding of the geotechnical and geophysical risks associated to your projects.

OUR KEY CAPABILITIES:

  • Well equipped with multi-beam (MBES), single-beam (SBES) and side sonars, including ROV
  • High availability of Taiwan-flagged survey vessels operated by experienced local crew
  • Inhouse surveyors
  • Unexploded ordnance survey
  • Metocean condition
  • Sediment sampling
  • Multi-beam / single-beam survey

Our Latest News:

Posted: 27/07/2023

INTERNATIONAL OCEAN GROUP ACQUIRES MAJORITY SHARES OF CWIND TAIWAN, BECOMING SOLE OWNER

Taipei, Taiwan, July 27 2023. International Ocean Group (IOG), a leading offshore wind farm services provider, announced today the successful […]

Posted: 17/01/2022

CWind Taiwan has been awarded a CTV charter contract with Siemens Gamesa for the third windfarm project

CWind Taiwan, a joint venture between International Ocean Group (IOG) and CWind, part of the Global Marine Group (GMG) has […]

Posted: 22/02/2021

CWIND TAIWAN TO SUPPORT VAN OORD IN CABLE ROUTE SURVEY FOR ØRSTED’S GREATER CHANGHUA 1 & 2a OFFSHORE WIND FARMS IN TAIWAN

CWind Taiwan has been awarded a contract by Van Oord to charter a survey boat for the near-shore cable route […]

Posted: 20/01/2021

CWIND TAIWAN TEAMED UP WITH E&Y ELECTRONICS TO DEVELOP TAIWANESE OFFSHORE CABLE MAINTENANCE MARKET

We are delighted to announce that CWind Taiwan have signed an exclusive cooperation agreement with E&Y Electronics (毅源有限公司) to develop […]

Posted: 14/12/2020

ATTRACTING LOCAL TALENT INTO THE TAIWANESE OFFSHORE WIND INDUSTRY: CWIND TAIWAN SPONSOR 100 STUDENTS AND FISHERMEN TO ATTEND GWO PILOT PROJECT

Taipei, 14th December 2020. CWind Taiwan announced that it is sponsoring up to 100 Taiwanese students and local fishermen to […]

Posted: 15/10/2020

CWIND TAIWAN AWARDED COUNTRY’S FIRST EVER BALANCE OF PLANT CONTRACT AT FORMOSA 1

Taipei, 15th October 2020. CWind Taiwan announced that it has been awarded a balance of plant (BOP) contract for Formosa […]

Posted: 02/09/2020

CWind Taiwan to deliver crew transfer service for wpd Yunlin project construction phase

Taipei, 1st September 2020. CWind Taiwan announced today that it has been awarded a contract by wpd to provide a […]

Posted: 10/08/2020

CWind Taiwan team up with HYTOR on temporary power in Taiwan

Taipei, 10th August 2020. CWind Taiwan, a joint venture between European firm CWind and Taiwanese IOVTEC, has announced a strategic […]

Posted: 10/06/2020

OREAC: 1,400 GW of offshore wind is possible by 2050, and wil be key for green recovery

– The Ocean Renewable Energy Action Coalition (OREAC) is an initiative led by major players in the  offshore wind industry, […]

Posted: 04/06/2020

CWind Taiwan expands CTV fleet to support Siemens Gamesa at Yunlin

CWind Taiwan acquires pair of class-certified 24m CTVs from Seacat Services as market collaborates to meet regional demand for high-quality […]

Posted: 14/05/2020

CWind Taiwan successfully completes seabed survey for DEME in Taiwan

CWind Taiwan has announced the successful execution of a seabed survey for DEME along the gas pipelines in the Anping […]

Posted: 26/03/2020

Adapting to ensure a continuation of service: our response to COVID-19

On behalf of the CWind Taiwan team, we would like to give you an update on the measures we are taking to cope with the effects of COVID-19.

Posted: 23/08/2019

CWind Taiwan awarded 2 crew transfer vessel charters for Formosa 1 offshore wind farm

CWind Taiwan announced that it has been awarded two Crew Transfer Vessel charters for Formosa 1 wind farm by FOWI […]

Posted: 19/08/2019

Taiwan’s first offshore wind training center accredited by Global Wind Organisation

Taipei, 8th July 2019. CWind Taiwan announced today that its invested offshore training centre, Taiwan International Windpower Training Corporation (TIWTC), […]